Turnkey factories, industrial facilities and logistics warehouses: from design to erection, from dismantling to re-erection, from a single source.

Since 1996 Gürteş has been carrying out factory construction, industrial facility and logistics warehouse projects. For the investor, turnkey projects, steel structure facilities, precast concrete industrial buildings and on-site fabrication meet in the same organisation.
In domestic and international projects all processes are carried out from a single source — from design through production and erection, from infrastructure and superstructure works through dismantling, transport and re-erection.
As the number of interfaces decreases, so do the risk of delay and gaps in responsibility.
Moving a facility to another location is a different engineering task from building a new one: element numbering, the transport plan and the re-erection sequence are set out in advance.
That steel and precast systems can be dismantled means the investment itself can be moved.
Domestic and international projects are carried out to international standards.
Projects are completed within the planned durations; the schedule is given by taking every stop from engineering to handover into account.
Because production capability and site application are in the same organisation, the scope is not split.
Share the scope, the scale and your delivery expectation; we will decide together which structural system is the right one.